ThoughtfulConstruction & Groundworks

Thoughtful · Groundworks and drainage · Fowey and south Cornwall

Retaining walls, drainage and treatment plants on steep plots.

Before anything can be built on a slope, the ground has to be held back and the water dealt with. We run groundworks from the first cut to the finished wall, on sites a lorry can't easily reach.

Finished tiered gabion retaining wall on a wooded slope near Fowey
Gabion retaining wall, near Fowey · built by Thoughtful
Groundworks and drainage

What we take on

The work in the ground that everything else depends on.

Where we work
  • Fowey
  • Polruan
  • Bodinnick
  • Lanteglos
  • Golant
  • Lostwithiel
  • Tywardreath
  • Par
  • St Austell
  • Mevagissey

How a job runs, from first message to handover

  • Retaining wallsTiered gabion walls and shuttered reinforced concrete.
  • Sewage treatment plantsInstalled on a concrete base, with the pipe runs to and from them.
  • Regulations planned inNew treatment plants need Building Regulations approval and have to meet the general binding rules for small sewage discharges. Both are priced in from the start.
  • Foundations and basesPier foundations, bases and footings for timber-frame buildings.
  • Chambers and drainage runsPrecast chamber rings set and pipe runs laid to fall.
  • Tight accessMini digger work on slopes, and concrete placed where a lorry can't reach easily.
Groundworks and drainageThe Treehouse plot, near Fowey

Retaining walls, a treatment plant and the drainage for a steep plot.

This is the ground the Treehouse stands on. Nothing could be built until the bank was held back and the drainage was sorted. We ran the job from start to finish, working on a slope with a mini digger and getting concrete to places a lorry couldn't reach easily.

We built tiered gabion walls to retain the bank, shuttered and poured a reinforced concrete wall, set precast chamber rings, and installed a sewage treatment plant on a concrete base with the pipe runs to and from it.

New treatment plants need Building Regulations approval and have to meet the general binding rules for small sewage discharges. Both are planned and priced in from the start, not discovered halfway through.

  • Tiered gabion retaining walls
  • Shuttered reinforced concrete
  • Treatment plant and drainage runs
  • Precast chambers
Finished tiered gabion retaining wall with a mini digger beyond
Concrete being poured into shuttering from a mixer truck
Gabion baskets being filled in tiers
Precast chamber ring set in the ground beside a mini digger
Sewage treatment plant set in its excavation

A sloping plot, retaining wall or drainage to sort out?Tell us about your projector call 07933 005029

Enquire

Tell us about your project

Call, text or email us directly. Or fill in four lines and it writes the message for you, ready to send.

Add more detail (optional)