

A sunken bath and shower formed in microcement.
The bath is built into the floor and finished in one surface with the walls. The basin was carved by hand from a single stone.
Thoughtful · Bathrooms · Fowey and south Cornwall
A good bathroom depends on what's underneath it. We strip the room back, put right the floor and the pipework, and finish in natural stone or microcement, with wet underfloor heating if you want it.
The parts you see, and the parts under the floor that decide how long it lasts.
The room had a bath across one wall, a tired suite, a toilet that relied on a macerator and a floor nobody had looked under for decades. The brief was a walk-in shower, warmth underfoot and walls without a grid of tile joints.
We stripped it out and opened the floor first, because a stone floor is only as good as what it sits on. Rotten joists and boards were replaced and the rest strengthened and levelled. The macerator went: we ran an entirely new waste pipe beneath the floor to meet the soil pipe outside, so the toilet now drains properly by gravity. A new subfloor went down, and a new stud wall carries the shower valve and pipework out of sight.
Wet underfloor heating, run from the central heating, went down beneath natural stone tiles on a decoupling membrane, which lets an old timber floor move without cracking the stone.
The walls are microcement rather than tile, with a shelf recessed along the length of the shower. Brass fittings, a single glass screen and a basin on a timber vanity finish it.












A bathroom or a period house that needs proper work?Tell us about your projector call 07933 005029


The bath is built into the floor and finished in one surface with the walls. The basin was carved by hand from a single stone.
Call, text or email us directly. Or fill in four lines and it writes the message for you, ready to send.